Project #01
PROJECTS NAME:
CAMP PROJECTS (TRADING & LOGISTICS DIVISION)
RUMAILA OPERATING ORGANIZATION(ROO)
PHASE 1
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
MOTT MACDONALD IRAQ MOTT MACDONALD DUBAI
SCOPE OF WORKS:
PROCUREMENT AND SUPPLY CHAIN CONSULTANCY FOR THE 300 MEN CAMP. PALS HAS SERVICED THE CLIENT WITH CHOOSING THE CONTAINER, PREFAB BUILDING MANUFACTURER, THE FURNITURE AND HOME TEXTILES MANUFACTURER, AND ALL THE LOGISTICS TRANSACTIONS DURING THE CONTRACT. IN ADDITION PALS HAS PROVIDED MAN POWER TO THE PROJECT TO FINISH ON TIME.
TIMELINE: 15.07.2010 – 15.02.2011




Project #02
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
PHASE 0 A LPHA
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURN KEY CONTRACT FOR THE 72 MEN CAMP WITH ALL CONTAINERIZED HOUSING UNITS, OFFICES, WELFARE AND CANTEEN BUILDINGS.
TIMELINE: 01.04.2011 – 15.05.2011




Project #03
PROJECTS NAME:
MEDICAL CLINIC TURNKEY PROJECTS(TRADING & LOGISTICS DIVISIONS)
RUMAILA OPERATING ORGANIZATION (ROO)
PHASE 1
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV - MOTT MACDONALD
SCOPE OF WORKS:
TURNKEY CONTRACT FOR ONE MEDICAL BUILDING WITH ALL FURNITURE, HOSPITAL EQUIPEMENT AND SUPPLIES. PALS TRADING DIVISON IS STILL SERVING THE CLIENT WITH ALL ONGOING REQUEST.
TIMELINE: 15.11.2010 – 30.11.2010




Project #04
PROJECTS NAME:
KAMP PROJESİ(İNŞAAT)
RUMAILA OPERATING ORGANIZATION (ROO)
BABYLON CAMP
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR THE 89 MEN CAMP WITH ALL CONTAINERIZED HOUSING UNITS, OFFICES, WELFARE, ABLUTION AND CANTEEN BUILDINGS.
TIMELINE: 15.10.2011 – 15.12.2011




Project #05
PROJECTS NAME:
KAMP PROJESİ(İNŞAAT)
RUMAILA OPERATING ORGANIZATION (ROO)
BABYLON OFFICES
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR 3 NUMBER OF 2 STOREY OFFICES. EACH BUILDING. THIS PROJECT IS THE FIRST 2 STOREY BUILDINGS BUILD AT ROO HEADQUARTERS. ALL CONCRETE WORKS INCLUDED.
TIMELINE: 05.11.2011 – 31.12.2011




Project #06
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
PROJECT CENTER
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR THE 17 MEN CAMP WITH ALL CONTAINERIZED HOUSING UNITS, ABLUTION UNTS, AND CANTEEN BUILDINGS. ALL CONCRETE WORKS INCLUDED
TIMELINE: 01.12.2011 – 31.12.2011




Project #07
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
BABY SINBAD BUILDINGS
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURN KEY CONTRACT FOR THE 126 MEN CAMP WITH ALL PREFABRICATED 2 STOREY DORMITORY BUILDING TOTAL 3000 SQM, CANTEEN BUILDING WITH DFAC AND KITCHEN AREA OF 900 SQM, LAUNDRY BUILDING SERVING THE CAMP AREA OF 300 SQM. ALL CONCRETE WORKS ARE INCLUDED
TIMELINE: 01.04.2012 – 30.07.2012





Project #08
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
BABY SINBAD OFFICES
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR 6 NUMBER OF 2 STOREY OFFICES.
TIMELINE: 01.03.2012 – 30.06.2012

Project #09
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION & TRADING DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
MULTIPLE FUNCTION CARAVANS FOR STATIONS
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR 72 NUMBER OF CUSTOM DESIGNED CONTAINERS. ALL CONTAINERS WILL BE FULLY ASSEMBLED AT PALS MANUFACTURING FACILITIES. THESE CONTAINERS WILL SERVE THE OIL & GAS COMPANIES PERSONNELS NEEDS AT THE STATIONS THROUGH OUT THE RUMAILA OIL FIELDS. PALS HAS DEVELOPED BLAST PROOF CONTAINERS FOR THIS PARTICULAR PROJECT.
TIMELINE: 01.03.2012 – 31.12.2012




Project #10
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
QUARMAT ALI
AREA:
BASRAH – IRAQ (8 KM FROM BASRAH INTL. AIRPORT)
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR THE 42 MEN CAMP WITH ALL PREFABRICATED SINGLE STOREY DORMITORY BUILDING CANTEEN BUILDING WITH DFAC AND KITCHEN LAUNDRY BUILDING SERVING THE CAMP AND OFFICES. CONCRETE WORKS ARE INCLUDED. THIS PROJECT IS ONE OF ITS KIND WITH OVERHEAD PROTECTION. ALL OVERHEAD PROTECTION IS CUSTOM DESIGNED ON BOTH OPTIONS – E GLASS AND STEEL STRUCTURE AND SAND BAGS AND STEEL STRUCTURE.
TIMELINE: 15.09.2012 – 30.10.2012




Project #11
PROJECTS NAME:
CAMP PROJECTS (CONSTRUCTION DIVISION)
RUMAILA OPERATING ORGANIZATION (ROO)
RSB
AREA:
SOUTH RUMAILA – BASRAH – IRAQ
CLIENT NAME:
BP IRAQ NV
SCOPE OF WORKS:
TURNKEY CONTRACT FOR THE 54 MEN CAMP WITH ALL CONTAINERIZED HOUSING UNITS, CANTEEN BUILDING WITH DFAC AND KITCHEN, OFFICES, LAUNDRY AND ABLUTION UNITS. THIS PROJECT IS THE FIRST CAMP PROJECT AT FSA – NORTH RUMAILA LOCATION. PALS IS THE FIRST COMPANY TO WON AWARD ON THIS LAND OF DEVELOPMENT.
TIMELINE: 15.07.2012 – 25.08.2012




Project #12
PROJECTS NAME:
LOGISTICS SERVICES (LOGISTICS DIVISION)
LOGISTICS CONSULTANCY
AREA:
RUMAILA – BASRA - IRAQ
CLIENT NAME:
AIR TECHNOLOGIES – MOTOROLLA DISTRIBUTOR
SCOPE OF WORKS:
LOGISTICS CONSULTANCY AND FREIGHT FORWARDER SERVICES
TO ALL ELECTRONICAL EQUIPMENT SUPPLIED TO RUMAILA OIL
FIELDS./p>
TIMELINE: 15.07.2010 – 15.02.2011